Projects
Some of the projects fulfilled by our company: Residential buildings Snow Pearl and St. George Lodge – Bansko – completing work; Administrative building Bulgartransgas – Botevgrad – overall work; Office building and hotel – Bulgarian Red Cross, Sofia – dry (plasterboard) building; Office building IGDS, Sofia – dry (plasterboard) building; Logistic center Frans Maas, Sofia – dry (plasterboard) building; Residential buildings, Sozopol, area Budzhaka – construction works; Residential building Sofia Estates I – dry (plasterboard) building; Administrative and industrial building of Dorma, Bulgaria – dry (plasterboard) building; Office building Toshiba, Sofia – dry (plasterboard) building; repairs of Austrian Embassy, Sofia, etc.
-
Vacation Village BojurLand - Bansko
The vacation village BojurLand is situated in downtown Bansko, at an area of 1.1 hectares. It is a residential-hotel complex of a closed type, consisting of eight buildings, with an approximate area of 1400 m2 for everyone of them. Read more -
Vacation Village Santa Marina – Sozopol
The vacation village Santa Marina is situated in Sozopol. It is a complex of low-storey buildings. Read more -
Residential Building - Sofia
The building is situated in downtown Sofia, in the street Tzar Ivan Assen II. It is a residential building with underground parking places. It is in process of building and the concrete structure and the roof of the building have been completed. The finishing works will be done in 2008. Read more -
-
